Reducing Rig Time in Gas Lift Completions

ShearLift-T
Interventionless Barrier Gas Lift Valves

A major Middle East Operator had been running unloading and operating gas lift valves as a part of their well completion. Due to the configuration of the completion, dummy valves were initially installed to allow the operator to independently test the tubing and annulus after the completion packer had been set. Once the tubing and annulus pressure tests were successful wireline interventions were performed to remove the dummy valves and install unloading and operating gas lift valves.